# What did we promise Juniper Coffee?

All records are fictional teaching fixtures. This is the answer produced from Agent 1’s evidence packet and the reopened original records, as of November 26, 2026.

**Three full-site feedback rounds were agreed, plus a later, separate homepage-headline follow-up—not unlimited revisions.**

## The agreement

Proposal v2 says **“Three rounds of consolidated feedback across the five-page website before launch.”** The November 21 client email explicitly approves that named proposal and its three rounds. [Proposal v2, line 6](SOURCE-BOOK.html#source-03-L6); [client acceptance, line 8](SOURCE-BOOK.html#source-04-L8). [C01]

The unlimited wording is real, but appears in rough kickoff notes and a proposal marked **“DRAFT — not sent or accepted.”** It is not the accepted version identified by the client. [kickoff notes, lines 8–10](SOURCE-BOOK.html#source-01-L8); [draft status, line 4](SOURCE-BOOK.html#source-02-L4); [draft wording, line 6](SOURCE-BOOK.html#source-02-L6). [C02]

## What we added afterward

The client asked for a headline follow-up on November 23. On November 24, the studio offered **one additional consolidated pass on the homepage headline only after launch**, provided collected feedback arrives by **December 11, 2026**. The client confirmed on November 25. [request, lines 8–10](SOURCE-BOOK.html#source-06-L8); [offer and condition, line 8](SOURCE-BOOK.html#source-07-L8); [confirmation, line 8](SOURCE-BOOK.html#source-08-L8). [C03]

Both sides’ later messages preserve the original **three full-site rounds**. The added headline pass is separate; it is not a fourth full-site round or a general unlimited-revision allowance. [studio clarification, line 9](SOURCE-BOOK.html#source-07-L9); [client confirmation, line 9](SOURCE-BOOK.html#source-08-L9). [C04]

## Useful project note

Track **three full-site feedback rounds**, plus **one separate homepage-headline follow-up**. Add a reminder for the client’s collected headline feedback by **December 11, 2026**. Before calculating remaining full-site rounds, ask the project owner how many have already been used: the supplied checklist expressly does not record that number. [unknown used-round count, line 6](SOURCE-BOOK.html#source-09-L6). [C01, C03–C05]

This is a suggested note; no tracker, calendar or live project was changed.

## Dated source trail

| Date | What the record establishes | Original source |
|---|---|---|
| 2026-11-18 | Rough kickoff notes record a question about unlimited revisions; final written scope still needed. | [E01](SOURCE-BOOK.html#source-01-L8) |
| 2026-11-19 | Unsent/unaccepted draft contains unlimited-revision wording and an internal instruction to revise it. | [E02](SOURCE-BOOK.html#source-02-L4) |
| 2026-11-20 | Sent proposal v2 specifies three consolidated full-site feedback rounds. | [E03](SOURCE-BOOK.html#source-03-L5) |
| 2026-11-21 | Client explicitly approves the named November 20 v2 proposal and its three rounds. | [E04](SOURCE-BOOK.html#source-04-L8) |
| 2026-11-23 | Client asks for one additional headline-only pass after launch, without another full-site round. | [E06](SOURCE-BOOK.html#source-06-L8) |
| 2026-11-24 | Studio offers one consolidated headline-only pass after launch, with collected feedback due December 11; full-site allowance unchanged. | [E07](SOURCE-BOOK.html#source-07-L8) |
| 2026-11-25 | Client confirms the bounded headline follow-up and unchanged three full-site rounds. | [E08](SOURCE-BOOK.html#source-08-L8) |

## Optional friendly message — unsent

> Hi Riley — for our project checklist, we have the three full-site feedback rounds from proposal v2, plus the separate consolidated homepage-headline follow-up we confirmed. Please send the collected headline feedback by December 11 so we can include that extra pass. Thanks!

Basis: C01, C03 and C04 above. This is a draft only.

## What this answer does not establish

The supplied folder does not establish rounds already used or remaining, any agreement outside this folder, actual launch completion, or receipt of future headline feedback. This summarizes the recorded project promises; it is not a legal determination. Agent 3 completed the source check with no substantive correction. The accompanying source ledger and checklist describe the verification and its limits.
